It is known that the house is one of the basics of life and its requirements that cannot be completely dispensed with and the best decision that a person can take is to think about housing while making it a primary goal in the economic strategy and providing the necessary funds to build a house. So what are the steps to follow to check all the basic elements before building any property? In this article, we will present to you the most important steps that must be followed and the things that must be examined before proceeding with the construction of the property.

  •    First: Finding suitable land to build the house.

You should think about buying a suitable residential land in one of the appropriate neighborhoods, which has all the necessary services such as electricity, water, means of communication, etc…
The budget must be taken into account when purchasing the land, for example, the purchase and construction of large lands may consume large sums of money, which may affect the budget sufficient to complete the house.
As an advice:  it must be ensured that the land is not low, which may make it a hotbed of swamps and watercourses, especially in the winter.

  • Second: Contracting with a consulting engineering office.

It is necessary to contract with a consulting engineering office accredited and authorized by government agencies to carry out design work, drawing maps and engineering plans, and specifying all technical specifications for building materials and the steps that must be implemented to build the house according to the approved specifications within a contractual framework between the owner and the engineering office.
As an advice: At this stage, attention must be paid to all the details to be implemented, no matter how accurate or partial they are, so they must be mentioned to the engineer so that he can incorporate them into the engineering plan.

  • Third: Follow up the procedures for obtaining a building permit to extract the cadastral report.

After completing the work of maps and designs, the consulting office entrusted to it follows up the procedures for obtaining a building permit or building permit after fulfilling all official requirements and implementing designs approved by the municipality or the responsible party, and after that we have complete approved and official maps and designs.

  • Fourth: Contracting with a construction company or building contractor.

To carry out the implementation of the approved maps and designs, a construction company or a building contractor who has similar works in the required design must be chosen before carrying out the contracting process, in order to ensure that all details are reviewed before signing the contract, which facilitates the implementation process later .
As an advice: It is preferable to submit maps and designs to more than one company in order to allow an opportunity to compare prices and the quality of services offered to each of them, then choose the appropriate company or contractor to implement the project.

  • Fifth and finally: Drafting the construction contract.

After choosing the executing company, it is necessary to start drafting the construction contract, the date of completion of the works, and handing over the keys. At this stage, the total cost of

implementing the project is agreed upon, as well as the implementation of all concrete works appropriately.